Nepal - Construction of 132/33kV New Pokhariya substation at Birgunj, Nepal and extension of existing 220/132kV Parwanipur substation of NA by 4 x 132kV Line bays (Job entrusted by AG-SPR JV)

Scope of Work :

1. Site visit of 3 man days for collection of preliminary data.

2. Complete design, engineering, preparation of basic and detail engineering drawings, design calculations and BOM for Electrical, Civil, Structural, Substation automation system, Communication system and Fire detection and alarm system of 132/33kV, 2 x 63MVA Pokhariya substation of NEA.

3. Design and engineering (Electrical, Civil and Structural) of 4 nos. new 132kV line bay extension at existing Parwanipur substation of NEA.

4. Preparation of ‘As Built’ drawings.

5. Our scope shall include discussion with AG-SPR JV / NEA in online / telephone / physical mode to provide clarification on drawings prepared by us. 