Feasibility study, Electrical system study of large power plants (steam and Gas), Basic engineering, preparation of Scope of work and Technical specifications of 380kV EHV and 33kV HV electrical equipment are delivered by us in Super critical thermal power plant projects in India and abroad.
The job comprises of site visit, data collection, discussions with the client at site, site measurements, checking feasibility of the proposed solution, checking Electrical suitability by power system software like ETAP, preparation of technical specifications of all concerned equipment, pricing of the equipment and systems.
Satcon's Sr. engineers have thorough experience in preparation of similar documents. This type of document helps the Client to take a firm techno commercial decision before starting of implementation of the project.